Brief description of Block-B Project

INTRODUCTION: Block-B Project is situated in Singrauli District of Madhya Pradesh. Block-B Project covers Gorbi-B, Gorbi-C and Vindhya Sub-Block. Gorbi-B & Gorbi-C are located on the north of Vindhya Sub-Block and Moher Block is on the south of Block-B. Its elevation is about about 375 mtrs. To 512 mtrs. above the MSL. It is located between the latitude - 23 ° 47 ’ and 24 ° 12 ’ North and longitude - 81 ° 48 ’ and 82 ° 52 ’ East.

COMMUNICATION: Project is connected with Gorbi Open-Cast Mine about 05 km fair weather road. Nearest Railway Station is Mahdeiya on Katni-Chopan Branch Line of East-Central Railway.

LIFE: The life of the project is 27 years with production rate of 3.5 MTPA excluding 02 years construction period. The Block-B Project was cleared by IMG in Nov. 2004 with a Capital Investment of ₹ 706.15 Cr. Subsequently re-casted Capital Investment of ₹ 753.25 Cr. EMP was cleared in May 2005. Recast Project Report (RPR) of Block-B OCP, NCL (Normative Capacity – 3.50 Mtpa, Peak Capacity – 4.375 Mtpa) for a Capital Investment of ₹ 535.10 Cr. , Base Date – July 2010.

GEOLOGICAL RESERVES: Net geological reserves is 142.63 MT and proved reserve is 110.67 MT. Mine able reserves seam wise OBR ratio is as follow: See More

SUB-BLOCK COAL RESERVES (MT) OB (MM3) SR (M3/T)
GORBI-B & C 27.69 20.68 48.37 171.25 3.54
VINDHYA 31.47 7.83 39.30 118.89 3.03
TOTAL (BLOCK-B) 59.16 28.51 87.67 290.14 3.31
LAND & FOREST:

Total leasehold area is 1339.00 Hectares including Forest Land is 447.00 Hectares.

Succession of coal seams up to Turra seam –
Particulars Thickness range (in meters)
Soil and sub soil 0.00 - 7.65
Strata above purewa seam up to 151.35
Purewa seam 24.00 - 28.31
Parting 63.39 – 78.47
Turra seam 14.95 – 26.23

Seams form western part of Moher sub basin and has generally easterly dips with North-South strike

Production & Dispatch :
  YEAR  PRODUCTION (MT) DISPATCH (MT)
Target Achievements Target Achievements
2010-11 3.50 3.807 3.5 3.911
2011-12 4.00 4.007 4.0 3.706
2012-13 4.25 4.375 4.25 4.486
2013-14 4.375 4.375 4.375 4.625
2014-15 4.375 4.475 4.375 3.798
HEMM Details
Equipment Make Model Capcity Nos.
SHOVEL KOMATSU PC-2000 12CUM 01
BEML BE 700 3.50Cum 1
Dumper BEML BH100 100T 10
CATERPILLER CAT777D-100T 100T 02
KOMATSU KOMATSU HD785-7 100T 3
Dozer BEML BD355 410HP 06
Drill REVTHI RECP65 160MM 02
Atlas Copco. IDM 30 160 MM 03
Crane TIL TIL 40T-RT 740 40T 01
ESCORT C-8000 11T 01
ACE FC 110 10T 01
Grader BEML BG 825 280 HP 2
Water Tanker BEML GW-28 28 KL 03
Tyre Handler BEML BL14 TH 3500 KG 01
TEXMACO     01
Pay Loader HM 72-21/20-21 1.91 CUM 01
BEML WA200 1.91 CUM 01
Welfare & CSR Related information:
EMPLOYEE WELFARE:

By providing better employees' welfare facilities, we show our employees that we value them. This can help make them feel welcome, happy and motivate them to work harder. The following facilities are provided to employees.

OFFICER’S CLUB:

Well maintained club with facilities like Auditorium, Badminton Court, Air Conditioned VIP Lounge and Dining hall.

GUEST HOUSE:
  • Well furnished and Air Conditioned 06 double bed rooms and 02 suites.
  • Breakfast, lunch and dinner is provided to all residents and other employees.

DISPENSARY:
  • 24 hr. service.
  • 02 Ambulances (01 Departmental and 01 Contractual).
  • 01 bed emergency room.
  • 01 doctors and 06 paramedical staffs.

WATER SUPPLY PLANT:
  •  Mainly potable water supplied from IWSS and 03 bore holes have also been provided in colony area. In case, supply of water from IWSS discontinues due to unavoidable reason, we provide water from the old Block-B mines sump, after due treatment which is better than IWSS.
  • Block-B is first project having its own such type of facility.
  • Capacity: 1 million ltr/ day.
  • Water treatment is done by using process like Aeration, Flocculation Coagulation using Lime, Alum, Sedimentation, Rapid Sand Filter and Disinfection using Chlorine in form of Bleaching Powder.
WORKERS CLUB:
  • Use by workers for marriage and other functions.
  • Facilities like utensils for catering, chairs, table etc. are provided to support them.
  • Recreational facilities like Badminton Court, Table Tennis, Carom, Chess and all other sports equipment are available.
CANTEEN:
  • One Canteen facility is provided to the workers in mining area.
BANK, POST OFFICE AND SCHOOLS:
  • Presently a branch of SBI, Madhyanchal Gramin Bank and Post Office each is running in campus.
  • One SBI ATM is also available for employees.
  • There are 01 Gov. Higher Secondary and 01 Govt. Primary school running. Apart from this 01 Shishu Mandir and 01 ECI school is also running.
RECENT CSR ACTIVITIES:
S.No. Sanction Year Name of the work/ activity fund provision sector Agreement Value(in Lakhs) Expenditure Status
1 2014-15 Construction of c/c road from Panchayat Ghar to house of Anish Khan via house of Shir Pal at Solang under CSR by Ananat Kumar Singh 70.00 Gaon Jodo Abhiyan 62.15 62.97 Completed
2 2014-15 Construction of women Skill Centre at Semuar Village 50.00 Kaushal 41.21 37.14 Completed
3 2015-16 Pond development at Chitahi Tola (Ph-II) 20 aadhar 0 0.00 fresh estimation is in process
4 2015-16 Construction of 1.2 km drain in Bargawan 60 aadhar 37.46 38.70 Completed
5 2015-16 Installation of bore well & submersible pump in girls hostelPadri. 1.5 Swachh Jal 1.50 0.45 Completed
6 2015-16 Construction of RCC road from main road to Kasar Basti from Block-B Project 180.00 Gaon Jodo Abhiyan 79.10 71.43 Completed
7 2015-16 Resurfacing of NH-75E road petrol pump to Purewa Nallah viaShukla More under CSR 2015-16 at Block-B Project 350.00 Gaon Jodo Abhiyan 182.00 190.30 Completed
8 2015-16 Providing furniture to Govt. Higher Secondary school, Padri 4 Sab Sakshar 2.96 2.96 Completed
9 2015-16 Providing furniture to Govt. Middle school, Solang 4 Sab Sakshar 2.76 2.76 Completed
10 2015-16 Providing furniture to Govt. Middle school, Mahdeiya 4 Sab Sakshar 2.76 2.76 completed
11 2015-16 Providing furniture to Govt. Higher Secondary school, Gorbi 4 Sab Sakshar 2.96 2.96 Completed
12 2015-16 Skill development training through CBWE 4.00 Kaushal 4 4 Completed
13 2015-16 Technical skill development programme 2.00 Kaushal 2 2 Completed
14 2015-16 Organising rural sports tournament 2.00 Khel tarang 2 2 Completed
15 2016-17 Construction of toilets in Chitrangi 15 aadhar 14.90 12.60 90 % Completed
16 2016-17 Construction of Check dam at Kuldahiya nala 25 aadhar 14.62 14.70 Completed
17 2016-17 Construction of laboratory in Govt higher secondary school Bargawan 50 Sab Sakshar 31.45 30.05 Completed
18 2016-17 Construction of road,culvert and small bridges from NH 75E near Pareva Nalla to Chamarkhoh in Karela Village 200 Gaon Jodo Abhiyan 120.25 41.76 Work in Progress
19 2016-17 Resurfacing of road from Gorbi chowki to Primary School, Moher 125 Gaon Jodo Abhiyan 80.89 7.75 work in progress
20 2016-17 Construction of 04 Anganwadi Centers in Singrauli 31.20 aadhar 6.07 work in progress
21 2016-17 Installation of 30 hand pumps 22.5 Swachh Jal 16.74 13.41 Completed
22 2016-17 Organizing Rural Sports tournament 2 Khel tarang Completed,
23 2016-17 Skill development training 5 Kaushal Completed,
24 2016-17 Providing Sewing Machine to a talented disabled girl Kumari Kopal 0.075 Kaushal Completed
25 2017-18 Installation of 30 hand pumps 23.7 Swachh Jal 15.10 0.00 Completed
26 2017-18 Construction of boundary wall in Govt. higher sec. school Kharkata 60 Sab Sakshar 30.84 31.77 Completed
27 2017-18 Repairing and maint. of Naudhiya bus stand and const. of public toilet 30 aadhar 0.00 work in progress
28 2017-18 Periodical cleaning and allied works of pond near SGRL Rly. Stn. 2 Swachh Jal 1.68 1.68 Completed
29 2017-18 Installation of solar pumps in nearby villages 50 Swachh Jal 0.00 in tendering stage
30 2017-18 Const. of 500 mtr. RCC road from mandir marg to house of Raghurai Kol 50 Gaon Jodo Abhiyan 29.00 Completed
31 2017-18 Development of area near check dam constructed at Kasar village over Bijul river 30 aadhar 0.00 Reestimation stage
32 2017-18 Supply of water through tankers in Muher village for 1 year 10 Swachh Jal 8.60 6.13 Work in Progress
33 2017-18 Skill development training through CBWE 10 Kaushal 10 9.41 Completed
34 2017-18 Organizing awareness camps in near by villages 2 Kaushal 2.00 1.18 Work in Progress
35 2017-18 Swachhta pakhwada 1.5 Misc. 1.5 1.25 Completed
36 2017-18 Finacial inclusion,digital literacy through basic computer training and awreness drive for the nearby villagers and vendors of Block B project under CSR for 2 years 4 Kaushal 4.00 3.09 Work in Progress
37 2017-18 Organizing Rural Sports tournament 2 Khel tarang 2.00 1.8 Completed
38 2017-18 Installation of solar lights in Kudwa, Chamarkho, Chitahi, Fuljhar, Khairidand and Angoora 20 aadhar 17.85 17.85 Completed
39 2018-19 Providing Learning tools, Furniture and other equipments in anganwadis and primary schools 10 Sab Sakshar procesed for purchase
40 2018-19 Providing uniforms,Sanitation/Health kits, school bags etc. in anganwadis and primary schools 5 Sab Sakshar procesed for purchase
41 2018-19 Organizing awareness camps on sanitation, health and hygeine, Govt. schemes and entitlements, education, livelihood enhancement practices etc in panchayats 5 Sab Sakshar Estimation stage
42 2018-19 Installation of sanitary pad vending machines in anganwadis 2 Sab Swasth 1.62 1.62 Purchase completed
43 2018-19 Hiring of Vehicle for transform singrauli project for 2 years 15 Misc 0 Hired
44 2018-19 Providing utensils for mid day meal in nearby Schools and anganwadis 2 Sab Sakshar 0 Tendered
45 2018-19 Supplementing the nutrition gap for malnurished women and children for alloted panchayats through aanganwadis 5 Sab Swasth 0 Estimation stage
46 2018-19 Installation of solar lights in unelectrified areas under transform singrauli project 20 aadhar 0 Tenederd
47 2018-19 Fund provision for community mobilisors/resource persons in alloted panchayats under transform Singrauli project 7 Misc 0 Estimation stage
48 2018-19 Providing lab equipments in nearby higher secondary schools 10 Sab Sakshar 0 Estimation stage
49 2018-19 Organizing rural sports and distribution of sports material in schools 3 Khel tarang 0 Will be organized in Dec-Jan
50 2018-19 Skill development trainings 10 Kaushal 0 Processed
51 2018-19 Running of Stitching & tailoring centre through Mahila Mandal and distribution of machines to the needy women. 5 Kaushal 0 Processed
52 2018-19 Fund for financial inclusion(training on digital literacy, bank account opening, seeding with aadhar/pan/schemes, etc) of villagers 5 Sab Sakshar 0 Processed
53 2018-19 Installation of ROs & watercooler in nearby schools 5 Swachh Jal 0 Processed
54 2018-19 Organizing swachhta pakhwada 2.5 Misc. 2.5 2.33 completed
55 2018-19 Providing uniforms, kits, learning tools etc in allotted Gram Panchayat to Block-B under Transform Singrauli Program 15 Sab Sakshar Processed
56 2018-19 Flexi fund for use on urgent basis under Transform Singrauli project” 10 Misc 4.45 10 work in progress
57 2018-19 Providing refuse collection vehicle in Naudhiya GP 5 Misc. Processed
58 2018-19 Supply of drinking water through tanker in Muher Village for 1 year 10 Swachh Jal 0 Tenedered
59 2018-19 Deepening of pond in Dadar Panchayat 50 aadhar 25.4 0 Tender opened
60 2018-19 Construction of boundry wall and aditional rooms, hand pump in Govt. Satellite Primary School Jamual, Kasar 60 Sab Sakshar 0 To be tenedered by this month
61 2018-19 Construction of puliya over Bukru nalla near Baiga basti ,Kasar 20 aadhar 0 Site surveyed
62 2018-19 Construction of Parewa nalla Cremation ghat,Gorbi 30 aadhar 28.44 0 LOA issued
63 2018-19 Construction of road from Padri Higher school to Solang Mode in Padri Panchayat (6.5 Km) 340 Gaon Jodo Abhiyan 0 Processed
64 2018-19 Construction of boundry wall in Govt. Primary school Pondi III 40 Sab Sakshar 0 Processed
65 2018-19 Construction of toilets in Madarsa ,Solang 5 aadhar 0 Site to be re-surveyed
66 2018-19 Construction of additional rooms in Govt primary schools shivri Tola,Pondi III 40 Sab Sakshar 0 Processed
67 2018-19 Development of pond in Gondwali Panchayat 20 aadhar Processed
68 2018-19 Construction of 3 nos. anganwadi with drinking facility in Gondwali Panchayat 30 Sab Sakshar Processed
69 2018-19 Cleaning of pond near Singrauli railway station 2 Swachh Jal Completed
70 2018-19 Construction of boundary wall in Primary School, Chamarkho Panchayat 30 Sab Sakshar Processed
71 2018-19 Construction of puliya in Gondwali Panchayat 30 aadhar Processed
72 2018-19 Installation of (50 nos ) handpums in nearby villages 35 Swachh Jal 0 Tender opened
73 2018-19 Construction of 3 nos. drains (800 mtrs) in Naudhiya GP 20 aadhar Processed
74 2018-19 Flexi fund for use on urgent basis under Transform Singrauli project 10 Misc. In Progress
ब्लाक-बी परियोजना में डिजिटल पेमेंट के फायदे बताये :

एनसीएल के ब्लाक-बी परियोजना में दिनांक ०७/०६/२०१७ को डिजिटल साक्षरता प्रशिक्षण कार्यक्रम का आयोजन किया | डिजिटल पेमेंट को बढ़ावा दिए जाने के मकसद से आयोजित किये गए | इस प्रशिक्षण कार्यक्रम में यूपीआई,यूएसएसडी, भीम मोबाईल,वालेट , कार्ड पेमेंट सहित अधार कार्ड आधारित डिजिटल पेमेंट की व्यवस्थाओ का प्रयोग करने हेतु लोगो को जागरूक किया | कार्यक्रम का लाभ ब्लाक-बी क्षेत्र के अधिकारियों , कर्मचारियों ,वेंडर्स ,कांट्रेक्टर्स , संविदा श्रमिकों , स्थानीय ग्रामीण यूवतीयो सहित लगभग ५० लोगो ने उठाया | कार्यक्रम में प्रतिभागियों को डिजिटल पेमेंट के फायदे बताये गए और उनसे अपील की गई की, बेहतर है की वे अपने रोजमर्रा के कार्यों में कैश की जगह डिजिटल पेमेंट का इस्तेमाल करे | भारत सरकार के इलेक्ट्रानिकी एवं सुचना प्रौधोगिकी मंत्रालय के तहत कार्य करने वाली संस्था कामन सर्विस सेंटर ( सीएससी ) के प्रतिनिधियों ने इस प्रशिक्षण कार्यक्रम में प्रशिक्षओ को डिजिटल पेमेंट के बारे में जानकारी दी | साथ ही भारत सरकार द्वारा चलाये जा रहे डिजिटल इंडिया कार्यक्रम की विडियो क्लीप भी प्रशिक्षओ को दिखाई गई ताकि वे डिजिटल पेमेंट की अहमियत से वाकिफ हो सके | सरकार की विभिन्न योजनाये जैसे डिजिटल व्यापार सहित सरकार की विभिन्न डिजिटल योजनाओ की जानकारी भी इस अवसर पर दी गई | प्रशिक्षण कार्यक्रम के आयोजन एवं उसे संपन्न कराने में सीएससी के डिस्ट्रिक मेनेजर एवं ब्लाक-बी परियोजना के अधिकारियों एवं कर्मचारियों की अहम भूमिका रही |

विश्व पर्यावरण दिवस 5 जून 2017:

विश्व पर्यावरण दिवस हर साल पांचवीं जून को मनाया जाता है। ब्लॉक-बी प्रोजेक्ट में पहले सभी ध्वज की मेजबानी और पर्यावरण को बचाने के लिए शपथ लेने के बाद ही पौधों के वितरण का आयोजन किया गया था और फिर विभिन्न प्रकार के पर्यावरण जागरूकता कार्यक्रम को रंगोली प्रतियोगिता, पेपर बैग जैसे आयोजन के लिए आयोजित किया गया था। ब्लॉक-बी प्रोजेक्ट एनसीएल के कल्याणी महिला मंडल की भागीदारी से प्राकृतिक संसाधनों और पर्यावरण को बचाने और बचाने के लिए पॉलिथीन बैग और ड्राइंग प्रतियोगिता के प्रतिस्थापन।.

MANPOWER:
NO. OF EXECUTIVES NO. OF MONTHLY RATED EMPLOYEES NO. OF DAILY RATED EMPLOYEES
74 118 300

Contact Details :

Discipline Name Designation CUG Email id
Mining Sri K P Dutta Project Officer 9406711808 ponclbb@gmail.com
Mining Sri Sudhir Kumar Staff Officer (M) 9406711129 sudhirk@coalindia.in
Excavation Sri Sunil Kumar Staff Officer (Excavation) 9406966373 sunil.7442@coalindia.in
E&M Sri P S Chakroborty Staff Officer (E&M) 9406966737 ps.c0915@coalindia.in
Civil Sri Narendra Kumar Staff Officer (Civil) 9406966432 narendra.5374@coalindia.in
Personnel Sri Sunil Kumar Tiwari Staff Officer (Personnel) 9406711813 sktiwari@coalindia.in
Finance Sri S K Laha AFM 9406711811 sanatan.laha@coalindia.in
Medical Sri Ajay Kumar SO (Medical) 8989452129 drajay.kr@coalindia.in
Materials Management Sri Prateek Singh Staff Officer (MM) 9479624282 prateek.s@coalindia.in