Amlohri Project

DESIGNATION

General Manager

EMAIL-ID

gm.aml.ncl@coalindia.in

CONTACT NO.

07805-277474

Brief description of Amlohri Project

Amlohri block is located in the southern western part of moher basin of Singrauli coalfields. Moher block lies on its west and Nigahi block in east.The feasability study prepared by CMPDI with participation of Russian experts in 1974 had identified Amlohri open cast mine with rated capacity of 10 MT/year of coal.The report was based on the available geological information in April 1982 for an initial capital investment of Rs.323.32 crore and was sanctioned by the government of India on 25 June 1982.

Brief about Amlohri
Feasability Report Sanctioned on 25-06-1982
Capital Investment Rs. 323.32 crore
Revised Coal Estimate Sanctioned Rs.527.11 Crore in Sept.90
OB Removal Started In 1983-84
Coal Production Started In 1987-88
Coal Despatch through Silo started In 1992-93
Project 4MPTA completed 31-03-1993
CHP fully Operational Sept. 1995
Scheme for development of West Section July 2002 for Rs.46.93 Crore
Seam Gradient 2 - 5
Stripping Ratio(Average) 4.41 Cum/Tonne
Depth of Quarry 300m
Area of Quarry 9.28 Sq. Km
Mineable Reserve 325.04MT
Volume of Overburden 1434.38 M. Cum
Production & Dispatch Details:
  YEAR  PRODUCTION (MT) DISPATCH (MT)
Target Achievements Target Achievements
2010-11 7.00 5.37 7.00 5.17
2011-12 6.50 6.58 6.50 5.88
2012-13 7.50 7.51 7.50 6.99
2013-14 8.50 8.51 8.50 9.04
2014-15 10.00 10.00 10.00 10.52
2015-16 10.00 10.52 10.00 10.46
2016-17 10.50 11.105 10.5 10.97
HEMM Details
Equipment Capcity Make & Model Nos.
Dragline 24 Cum. 24/96 W2000 01
24 Cum. HEC 24/88 01
SHOVEL RB/BE 195B 10 Cum/td> 01
BEML BE1600 9.5 Cum/td> 03
DUMPER Terex 33-11D 85 Ton 01
HM/CAT777C 85 Ton 02
BEML BH-85-1 85 Te 14
BEML BH-120 120 Ton 10
BEML BH100 100 T0n 07
CAT 777D (100T) 100 Ton 14
KOMATSU HD785-7 100 Te 02
Dozer BEML D355A3 410 HP 10
KOMATSU D475A5 860 HP 02
Wheel Dozer G30D 280 HO 02
Drill IDM 70E 250 MM 03
RECP 750E 250mm 02
RECP 650 160 mm 04
LMP SK 60E 250 mm 02
RECP 850E 311 MM 01
DMH 311 311 mm 01
Grader GD-605R1/R2 145 HP 01
GD-825A-1 280 HP 01
BG-825 280 HP 03
CAT14M 280 HP 02
Hydraulic Excavator H-40 Demag 2.8 Cum 01
L&T 300CKD-II 2.8 Cum 01
Water Sprinkler/Tanker BEML WS-28-2 W 35 T 03
33-11-D Water Tanker 85 T 02
BEML BH-85-1 W/Tanker 28 KL 03
Crane Grove RT880 90 T 02
Grove RT620 20 T 01
Ace Rhino 90C 9 T 02
Tyre Handler Beml-G 14Th   01
Manpower
NO. OF EXECUTIVE NO. OF MONTHLY RATED NNO. OF DAILY RATED
148 258 1496
ACHIEVEMENTS :
  • The project achieved 10MT status in 2014-15, the highest ever in the history of Amlohri Project. Similarly in dispatch, project has despatched 10.52 MT, all thru rail mode.
  • Similarly in dispatch, project has despatched 10.52 MT, all thru rail mode
  • In safety week 2014-15 held at Nigahi, project was given following awards for
  • i. Best haul road in outsourcing patch
  • ii. Best shovel maintenance
  • iii. Best overall excavation engineering

Contact Details :

Discipline Name Designation Phone / CUG e-Eail id
Mining Shri S.K.Jha Area General Manager 07805-278474 gm.aml.ncl@coalindia.in
Mining Shri Satish Jha General Manager / Project Officer 9406711702 satish.jha@coalindia.in
Excavation Shri P. N. Tiwari Staff Officer (Excavation) 9406711738 ---
E&M Sri Ashok Kumar Staff Officer (E&M) 9406711704 ashok.k@coalindia.in
Finance Shri U. K. Biswas Area Finance Manager 9406711008 uttamk.biswas@coalindia.in
MM Shri I.P.Singh Staff Officer (MM) 9406711709 ip.singh@coalindia.in
Civil Shri B. K. Singh Staff Officer(Civil) 9406963649 bk.singh5211@coalindia.in
Personnel Shri P. K. Dubey Staff Officer (Personnel) 9406711708 pk.dubey2984@coalindia.in
Medical Dr. A. K. Tiru Medical Officer 9406711735 drak.tiru@coalinidia.in 
Mining Sri K. P. Pathak Sr. Manager 9406711740 kp.pathak8296@coalindia.in
Systems Sri Pranshu Jaishwal AM(Systems) 9406966193 ...