Jhingurda Project


Overview :

The Jhingurda Project quarry was opened in 9th Feb 1965 in the eastern part of the block in this patch 48 boreholes were locket and since the seam has already been quarried. Located between latitudes 24'12'31 and longitudes 82'42' and 82'44'30.Located in North Eastern part of Singrauli Coalfields about 5 km east of Singrauli Railway Station.The Area is well connected by road with Renukoot in U.P. and Waidhan in M.P.,Singrauli Railway station on Obra - Katni branch is about 5 km in the west. The Jhingurda block has a pictures of surrounding having a high hill in the north. The foreground where the seams outcrops is undulating and drained by westerly flowing Jhingurda nala and its feeders which meet chatka nala in the west. The highest point on the hill top is 490m above M.S.L.The hills are thickly forested and the foreground is cultivated at places.The climate is extreme with summer temperature as high as 120 degree F during May-June and winter temperature goes down to 30 degree F in December-January.The average annuak rainfall is around 1000mm. See More

Brief about Jhingurda
Date of opening of Project 09-02-1965
Parting between JRD Top & Bottom Seam 31 to 58 M
Jhingurda Bottom Seam 9.38 to 19.62 M
Gradient 8 to 12 Degree (1 in 5 )
Mining Area 235 Hect.
External O B Dump 214 Hect.
Depth of Working 323 M (From Hill Top to Sump)
Mineable reserve to up dated 130.46 Mill.Tes(Extraction up to March/2013=126.16 Mill.Tes)
Balance reserve to up dated 3.80 Mte.Coal as on 01-04-2013 (As per Committee Report )
Balance reserve to up dated 2.75 Mte.Coal as on 01-04-2013 (As per PR)
Grade of coal GCV-Exceeding 4300-not Exceeding 4600(G-10)- ROM
Tree Plantation 1656728 (up to 2013-14)
Balance life of Mine 3 Years
Required Stripping Ratio 1:4
Volume of Overburden 1434.38 M. Cum
Performance :

Production/Target/Achievement of Last 5 years

Year Coal Target Coal Achievement OB Target OB Achievement
2009-10 40 23.76 55 43.1
2010-11 10 14 55 26
2011-12 10 10.6 30 26.09
2012-13 9 11.26 30 8.7
2013-14 15.25 15.6 10 8.93
2014-15 25 22.66 10 9.07
 
Equipments :

Manpower :
Executive MR DR Total
62 114 396 572
Awards :

Jhingurdah Project has been awarded National Safety Awards (Mines) for the year 2011"LONGEST ACCIDENT FREE PERIOD & for the year 2012 "LOWEST FREQUENCY RATE " by Hon'ble President of India in the function held at New Delhi on 20.03.2015.

Contacts :

Name Designation Office CUG
Sri S.K. Gomasta General Manager 51501/51451 9425176631
Sri K,Murleedharan Sr. P.A 51501/51451 9406711147
Sri Kumod Mistry Dy. GM(M) 51402 9406711102
Sri Brajpal Singh GM(Excv.) 51404 9406711103
Sri D.C. Saxena Dy. GM(E&M) 51403 9406711104
Sri P.K. Some Dy. GM(Civil) 51405 9406711106
Sri S.K. Shah Staff Officer(Pers.) 51474 9406711114
Sri R.K. Rai System Incharge 51680 9425177846